LaVille Elementary School and Jr/Sr High School 2020 Improvements and Related Work

Additions and improvements and renovations at both school buildings including site and site utilities work, concrete, masonry, structural steel/joists/deck, cold formed metal framing, floor/wall/ceiling finishes, wood and HM doors/frames/hardware, aluminum storefront entrances, aluminum windows, PLAM casework, solid surface tops, wall tile, resilient base, interior painting, toilet partitions, toilet room accessories/hand dryers, lockers, visual display boards, classroom signage, and food service equipment.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Drawings Elementary School 22.9 MB
Drawings JR-SR HS 24.1 MB