LaVille Elementary School and Jr/Sr High School 2020 Improvements and Related Work
Additions and improvements and renovations at both school buildings including site and site utilities work, concrete, masonry, structural steel/joists/deck, cold formed metal framing, floor/wall/ceiling finishes, wood and HM doors/frames/hardware, aluminum storefront entrances, aluminum windows, PLAM casework, solid surface tops, wall tile, resilient base, interior painting, toilet partitions, toilet room accessories/hand dryers, lockers, visual display boards, classroom signage, and food service equipment.
Specs
(click to expand/collapse)

Name | Size | ||
Project Manual Volume 1 (3) | 12.0 MB | ||
Project Manual Volume 2 (3) | 2.3 MB | ||
Project Manual Volume 3 (1) | 3.2 MB |